Meadow Vale School – Bracknell

We were called in following a series of power failures to the school.

It was found that the electrical supply was being overloaded.

We installed load-monitoring equipment to ascertain the loads being drawn from the supply.

After analysing our findings, we carried out some redistribution across the supply phases to prevent further power failures.

We negotiated with the supply authority to install a larger capacity supply.

We carried out all necessary groundwork and repairs and fitted a replacement main switch panel – providing capacity for future expansion.

Approx Value £15,000