Archive for November, 2010

Basingstoke and Dean Council

Basingstoke and Dean Council

 

One of the most difficult projects we have undertaken.

The work involved the removal and replacement of the old existing cubical switchgear and refurbishment of the existing distribution boards throughout the building.

All the work was carried out beyond normal working hours and weekends – one mistake would have meant Basingstoke and Dean Council would have been out of operation.

 

More...

Domestic Rewiring - Wokingham

Domestic Rewiring – Wokingham

 

Prior to building an extension – working in conjunction with the builder and the homeowner – we carried out a full electrical test upon the property.

It was established that major rewiring was required.

Working closely with the client, the property was rewired with the minimum of fuss and provisions were made for the future building works.

 

More...

New Build - Virginia Water

New Build – Virginia Water

 

Working closely with the client we designed and installed a high quality installation featuring:

  • Scene controlled lighting
  • Data network
  • Energy efficient controls
  • Domestic fire alarm

 

More...

Milbanke Court - Bracknell

Milbanke Court – Bracknell

 

Working in conjunction with the property owner we transformed a tired 1998 office building into a clean modern working environment, incorporating:

  • New ceilings and lighting
  • New flooring
  • Perimeter skirting trunking
  • Structured cabling
  • Partitions and Decorations

 

More...

Ivydene House - Bracknell

Ivydene House – Bracknell

 

On behalf of our clients we carried out a complete refurbishment of this character office building, which included:

  • The formation of new driveway and parking area
  • A complete internal and external fit out and decorations
  • New electrics
  • New heating
  • Installation of a new kitchen and disabled toilet

 

More...

Meadow Vale School - Bracknell

Meadow Vale School – Bracknell

 

We were called in following a series of power failures to the school.

It was found that the electrical supply was being overloaded.

We installed load-monitoring equipment to ascertain the loads being drawn from the supply.

 

More...

Uplands School - Sandhurst

Uplands School – Sandhurst

 

A new automatic fire alarm and class change system throughout the school to include:

  • Supply
  • Commissioning
  • As installed drawings
  • Certification
  • Staff training

 

More...

Abbey School - Reading

Abbey School – Reading

 

The project involved the complete relocation of the existing school distribution system to facilitate the construction of a new building.

Working directly with the school and their consultants, we arranged with the local supply authority to divert their existing supplies.

The existing cubical main switch was then dismantled and relocated in a new building.

 

More...

Weydon School - Farnham

Weydon School – Farnham

 

An extension to the existing science block to form state of the art science rooms.

Working closely with the building services consultants, the installation included:

  • Smart lighting
  • New mains distribution
  • Teaching control units
  • Data and Fibre network
  • Fire alarm
  • Energy saving controls
  • Lightning protection
  • Security systems

 

More...

Library Lighting - Reading

Library Lighting – Reading

 

Working closely with our client we designed and installed a new energy efficient lighting scheme to the library, which had an unusual roof design.

The lighting was designed to provide the required amount of lux level for a library – it also incorporated up lighting to enhance the roof design and provide a feeling of space.

 

More...